13230 SW 132nd Avenue, Unit B4, Miami, FL 33186 Β· Mon–Fri 8am–5pm ET

Labor Shortage in Construction: How Easy-to-Install IMPs Save Your Profit Margins

by Panelmart | Apr 14, 2026 | Cold Storage Solutions, Food Processing | 0 comments

Stocked in the US | Nationwide Delivery

Sanitary Profiles

CoRoundβ„’ PVC cove bases, pre-formed corners and corner guards

Insulated Panels

GlobeWall sandwich panels for walls, ceilings, and walk-in coolers

Technical Support

Expert guidance from specification to installation

Nationwide Delivery

Stocked in the US, delivered nationwide

Custom Solutions

Cut-to-size panels

By The Panelmart Engineering Team | Fact-Checked & Updated: April 2026

How Can Insulated Metal Panels Help Reduce Installation Time and Overall Construction Costs?

Quick Answer: To overcome the construction labor shortage, builders are switching to contractor friendly insulated panels. These symmetrical, easy-install Insulated Metal Panels (IMPs) eliminate site orientation errors, reduce installation time by up to 30%, and significantly lower the Total Installed Cost β€” the metric that actually determines project profitability.

The construction industry in the United States is facing a critical challenge: a massive labor shortage. With wages for skilled installers reaching $40–$50 per hour, the time spent on a job site has become the single most significant factor in determining a project’s profitability. For builders, choosing the right materials is no longer just about the price per square foot; it is about finding contractor friendly insulated panels that simplify the job and protect margins.

Why Is Labor the Biggest Cost in IMP Installation?

Traditional building materials often require specialized skills and intensive manual labor. When using older systems that are difficult to align or require specific interior/exterior orientations, the risk of costly delays increases significantly. According to the U.S. Bureau of Labor Statistics, construction labor costs continue to climb year over year, making fast installation a necessity for maintaining healthy margins. Furthermore, the Associated General Contractors of America reports that over 80% of contractors struggle to find qualified craft workers.

  • High hourly rates: Every extra hour on a crane or lift drains your profit directly.
  • Specialization gap: Finding crews that understand complex “one-way” panel systems is becoming increasingly difficult.
  • Site mistakes: Installing a panel backward can lead to thousands of dollars in rework and wasted material.

How Do Contractor Friendly Insulated Panels Reduce Site Errors?

One of the most effective ways to combat labor issues is by specifying reversible sandwich panels. Unlike traditional systems that have a dedicated “inside” and “outside” face, symmetrical reversible sandwich panels feature the same ribbing on both sides. This foolproof design is what truly defines contractor friendly insulated panels.

Zero orientation mistakes: Your crew does not need to double-check which side is facing out. This is especially critical when specifying easy install walk in cooler panels, where installation speed directly impacts refrigeration commissioning schedules. If a piece is cut incorrectly, the remnant can often be flipped and used elsewhere, virtually eliminating site waste. For a complete guide to finishing walk-in cooler perimeters, see our cold storage PVC cove base guide.

Simple tongue-and-groove joints: A simplified joint system allows for a faster click-and-go workflow. As a result, fast installation IMPs reduce the need for highly specialized technical expertise on-site. Your core team accomplishes more in less time β€” and fast installation IMPs translate directly into lower crane and lift rental costs per project.

Is Total Installed Cost More Important Than Material Price?

With recent steel tariffs impacting the market, many project managers focus solely on raw material price. However, the Total Installed Cost is the metric that actually matters. A panel that installs 20% faster is significantly cheaper at the end of the project. It generates savings on heavy machinery rentals, crane time, and hourly wages that far exceed any material price premium.

At Panelmart, we focus on providing a complete, efficient system. By planning your project with an 8-week lead time for our European-engineered panels, you secure a highly efficient build. Combining these panels with our in-stock PVC sanitary cove base ensures that the finishing stage β€” the washdown-readiness of your floor-to-wall junctures β€” is just as fast as the structural assembly.

For food processing facilities and commercial kitchens, finishing speed matters equally. Our snap-on CoRound cove base system uses the same labor-saving logic as our IMPs. Pre-formed corners eliminate mitre cuts. Mechanical fastening eliminates adhesive curing time. Consequently, your crew can move to the next section immediately. For USDA-regulated plants, see our guide on USDA compliant cove base requirements.

Ready to Reduce Your Labor Costs on the Next Project?

In summary, switching to contractor friendly insulated panels combined with a fast snap-on cove base system gives your crew a measurable competitive advantage on every build.

Contact Our Team Today For Panel Specifications, Lead Times, And Complete System Solutions

πŸ“ž +1 786 917 8106 Β |
βœ‰οΈ [email protected]
Contact Panelmart today to discuss solutions shipped directly to your job site anywhere in the United States.

Available by the box or by the piece

Shop the CoRound System

Our Mission

Mission Statement

To provide insulated panels and sanitary wall systems to US contractors, with technical support from specification to installation.

Our Vision

To grow across the US as a distributor of insulated sandwich panels and sanitary cove base systems, known for expert technical support.

Why Choose Us

βœ“ No sealant line required along the wall
βœ“ Pre-formed corners, no silicone-filled field cuts
βœ“ No resin or cement to cure
βœ“ Technical support and specs
βœ“ Free samples on request
βœ“ Complete systems from one source
βœ“ Nationwide delivery

CoRound Applications

Cold storage warehouse

Cold Storage

PVC is a thermal-break material: it conducts far less heat than metal.

βœ“ Walk-in coolers
βœ“ Freezers
βœ“ Refrigerated warehouses

Milk bottles on a food processing line

Food Processing

Resistant to common cleaning chemicals; can be washed with water up to +140 Β°F.

βœ“ Meat
βœ“ Dairy
βœ“ Bakery
βœ“ Beverage production

Empty cleanroom

Cleanrooms and Labs

Applications also include cleanrooms and pharmaceutical facilities.

βœ“ Cleanrooms
βœ“ Laboratories
βœ“ Pharmaceutical facilities

Commercial kitchen with stainless steel equipment

Commercial Kitchens

In a room already in operation, CoRound can be installed on the finished floor: there is no floor to redo and nothing to cure.

βœ“ Restaurants
βœ“ Commissaries
βœ“ Food service


Call

+1 786 917 8106 (phone and WhatsApp)


Address

13230 SW 132nd Avenue, Unit B4, Miami, FL 33186 Β· Mon–Fri 8am–5pm ET

Get a Quote, Specs or Free Samples

4 + 10 =